Installation of Helical Piles
SPRING HILL, Fla., May 18, 2018 (Newswire.com) - Chosen for their reputation, All Florida Ram Jack came in and graded foundation soils and installed 12 helical piles to support a new pre-built structure building. A property owner on the Weeki Wachee River wanted to add the building to their land but needed grading and a brand new foundation slab.
Imagine wanting to add to an already beautiful landscape but needing foundation work done first. That’s what happened with a landowner beside the Weeki Wachee River. The ground needed to be compacted and strengthened before the weight of a prefabricated building could be added. In lieu of this, the owner contacted All Florida Ram Jack to come in and evaluate the situation.
After proposing a satisfactory plan of action, Ram Jack graded the necessary soils and installed 12 helical new construction piles to support the to-be-built foundation. In the end, the owner was pleased with the results and neighbors were glad Ram Jack’s work posed minimal disruptions to the environment.
Source: Ram Jack
Share:
Tags: construction, foundation, helical pile, Ram Jack, slab